当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:文中介绍了武汉二环线工程绿色施工的综合技术措施是什么意思?

待解决 悬赏分:1 - 离问题结束还有
文中介绍了武汉二环线工程绿色施工的综合技术措施
问题补充:

  • 匿名
2013-05-23 12:21:38
Described in the technical measures of the green construction of the Second Ring Road project in Wuhan
  • 匿名
2013-05-23 12:23:18
It describes 2 Wuhan Ring works green construction of an integrated technical measures
  • 匿名
2013-05-23 12:24:58
In the article introduced the Wuhan two loop line project green construction comprehensive technical measure
  • 匿名
2013-05-23 12:26:38
Wuhan green construction of the second link are described in comprehensive technical measures
  • 匿名
2013-05-23 12:28:18
describes a 2 loop works green construction of an integrated technical measures;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭