|
关注:1
2013-05-23 12:21
求翻译:文中介绍了武汉二环线工程绿色施工的综合技术措施是什么意思? 待解决
悬赏分:1
- 离问题结束还有
文中介绍了武汉二环线工程绿色施工的综合技术措施
问题补充: |
|
2013-05-23 12:21:38
Described in the technical measures of the green construction of the Second Ring Road project in Wuhan
|
|
2013-05-23 12:23:18
It describes 2 Wuhan Ring works green construction of an integrated technical measures
|
|
2013-05-23 12:24:58
In the article introduced the Wuhan two loop line project green construction comprehensive technical measure
|
|
2013-05-23 12:26:38
Wuhan green construction of the second link are described in comprehensive technical measures
|
|
2013-05-23 12:28:18
describes a 2 loop works green construction of an integrated technical measures;
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区