求翻译:甲方变更设计委托事项或因提交的资料错误,或对所提供资料作较大修改未及时通知乙方,造成乙方设计返工,除双方需协商签订补充合同(或另订合同),重新明确有关条款外,甲方应按乙方所耗且经甲方确认相关工作量向乙方支付相应的费用。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
甲方变更设计委托事项或因提交的资料错误,或对所提供资料作较大修改未及时通知乙方,造成乙方设计返工,除双方需协商签订补充合同(或另订合同),重新明确有关条款外,甲方应按乙方所耗且经甲方确认相关工作量向乙方支付相应的费用。
问题补充:

  • 匿名
2013-05-23 12:21:38
Party the matters entrusted to change the design or the information submitted by error, or to make large changes to the information provided is not timely notify Party B, resulting in B design rework, signed a supplementary contract (or other contracts in addition to the two sides need consultation)
  • 匿名
2013-05-23 12:23:18
Party A shall issue or change your design commissioned by the information submitted to error, or the information provided to make more significant changes is not timely notification by Party B, Party B design rework, in addition to the two sides negotiated and signed with additional contract (or oth
  • 匿名
2013-05-23 12:24:58
Because the party of the first part changes the design request item or the material which submits is wrong, or to provides the material to be the big revision not prompt notice second party, creates the second party to design doing over, must consult the sign supplement contract except both sides (o
  • 匿名
2013-05-23 12:26:38
Customer change the design matters entrusted or submission of inaccurate information, or information provided extensive revisions did not inform party b, caused by str design rework, with the exception of parties required consultation signed a supplementary contract (or separate contracts), identify
  • 匿名
2013-05-23 12:28:18