当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:项目经理部应对施工质量检查进行策划,包括质量检查的依据、内容、人员、时机、方法和记录。策划结果应按规定经批准后实施。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
项目经理部应对施工质量检查进行策划,包括质量检查的依据、内容、人员、时机、方法和记录。策划结果应按规定经批准后实施。
问题补充:

  • 匿名
2013-05-23 12:21:38
The project manager to deal with construction quality inspection planning, including the basis of the quality inspection, content, personnel, timing, methods and records. Planned results should be required to be implemented after approval.
  • 匿名
2013-05-23 12:23:18
Project manager responsible for the quality of construction, including planning for quality check, based on what, WHO, the timing, methods, and records. Results should be required by the Planning Approval.
  • 匿名
2013-05-23 12:24:58
The project management should carry on the plan to the construction quality testing, including quality testing basis, content, personnel, opportunity, method and record.The plan result should implement according to the stipulation after the authorization.
  • 匿名
2013-05-23 12:26:38
Project construction quality inspection should be planned, including quality checks, content, people, based on the timing, method and recording. Planning implementation after ratification, the results should be required.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭