当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:工程总承包应对机组整体启动、联合试运行,以验证机组性能和可靠性,当完成上述试验,应按规定出具完整的检验和试验报告。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
工程总承包应对机组整体启动、联合试运行,以验证机组性能和可靠性,当完成上述试验,应按规定出具完整的检验和试验报告。
问题补充:

  • 匿名
2013-05-23 12:21:38
EPC response to the unit as a whole start of the joint trial run to verify unit performance and reliability when completing this test should be required to issue a complete inspection and test reports.
  • 匿名
2013-05-23 12:23:18
Engineering units should be the overall startup and run in order to verify performance of the unit, when completed and reliability testing, the above should be required for complete inspection and test report.
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
EPC unit starts as a whole, the joint trial operation, to verify the performance and reliability, when finished testing, should be required to produce a full inspection and test reports.
  • 匿名
2013-05-23 12:28:18
The project primary contractor should start to the unit whole, tries move jointly, confirms the unit performance and the reliability, when completes the above experiment, should according to the stipulation writing up integrity examination and the test report.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭