当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:室外日平均气温连续5天稳定低于5℃即进入冬期施工;当室外日平均气温连续5天稳定高于5℃ 时解除冬期施工。为确保冬期工程的顺利进展,我方项目部采取的对策如下:是什么意思?

待解决 悬赏分:1 - 离问题结束还有
室外日平均气温连续5天稳定低于5℃即进入冬期施工;当室外日平均气温连续5天稳定高于5℃ 时解除冬期施工。为确保冬期工程的顺利进展,我方项目部采取的对策如下:
问题补充:

  • 匿名
2013-05-23 12:21:38
The average temperature for five days of outdoor day stable below 5 ℃ to enter the winter construction; lifting construction in winter when the outdoor daily average temperature of 5 consecutive days of stable higher than 5 ℃. To ensure the smooth progress of the winter phase of the project, the cou
  • 匿名
2013-05-23 12:23:18
outdoor temperature on 5 consecutive days to stabilize the low, i.e. to 5 °C winter phases; when the outdoor temperature on 5 consecutive days C stability greater than 5 degrees at winter phases. Winter phase of the project to ensure the smooth progress of our project, the approaches taken are as fo
  • 匿名
2013-05-23 12:24:58
Outdoor daily average temperature continual 5 days is lower than stably 5℃ namely enters the beginning of winter time construction; When outdoor daily average temperature continual 5 days is higher than stably 5℃ relieve the winter time construction.In order to guarantee the winter time project the
  • 匿名
2013-05-23 12:26:38
Outdoor daily temperature stability is less than 5 ° c for 5 consecutive days entered the winter construction; when the outdoor temperatures stable for 5 consecutive days above 5 ° c winter construction of disarmament. To ensure the smooth progress of the project in winter, our project Department re
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭