求翻译:5Fu水解反应楼梯已经加固,精制车间精制罐平台已修补,冷却水系统电缆(审核时为临时用电)并入电缆线沟。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
5Fu水解反应楼梯已经加固,精制车间精制罐平台已修补,冷却水系统电缆(审核时为临时用电)并入电缆线沟。
问题补充:

  • 匿名
2013-05-23 12:21:38
5fu hydrolysis reaction of the stairs has been consolidation, refining plant purification tank platform repair, temporary power for the cooling water system cable (Audit) into the cable groove.
  • 匿名
2013-05-23 12:23:18
Stairs Fu hydrolysis reaction may have been fortified and refined shop refined tank platform have been patched and cooling water systems for cable (Audit, temporary use of electricity) into cable.
  • 匿名
2013-05-23 12:24:58
The 5Fu hydrolitic reaction staircase already reinforced, purifies the workshop purification pot platform to patch, cooling aqueous system electric cable (when verification for uses electricity temporarily) merges the electric cable cable duct.
  • 匿名
2013-05-23 12:26:38
5Fu hydrolysis stairs have been reinforced, refining tank platform has been refining workshop repair, cooling water system cable (when auditing for temporary power supply) into a cable Groove.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 