当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:1、 框算按设计方案相关资料编制,其中电气材料和安装价格水平为上海地区价格,施工土建部分参考了现收集到的非洲地区主要地材价格信息。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1、 框算按设计方案相关资料编制,其中电气材料和安装价格水平为上海地区价格,施工土建部分参考了现收集到的非洲地区主要地材价格信息。
问题补充:

  • 匿名
2013-05-23 12:21:38
1, the frame count design data preparation, including electrical materials and installation price level price for the Shanghai area, the construction of civil engineering part of the reference to the African region flooring price information is collected.
  • 匿名
2013-05-23 12:23:18
Box 1, * count by design related information, including electrical materials and installation price levels for the Shanghai region, the construction engineering and construction of the reference collection is now in the African region to supply price information.
  • 匿名
2013-05-23 12:24:58
1st, The frame calculates according to the design proposal correlation data establishment, in which electric material and the installment price level for the Shanghai area price, the construction construction part has referred to the African area mainly material price information which presently col
  • 匿名
2013-05-23 12:26:38
1, box is prepared on the design of programme-related information, in which electrical materials and installation price level for prices in Shanghai area, construction of civil engineering section references the main flooring price information is now collected in Africa.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭