当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:以上述各部分工程造价的直接费用作计费额,取难度系数为0.85,专业调整系数送变电项目为1.2。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
以上述各部分工程造价的直接费用作计费额,取难度系数为0.85,专业调整系数送变电项目为1.2。
问题补充:

  • 匿名
2013-05-23 12:21:38
The direct costs of the various parts of the project cost, billing amount, take the difficulty factor of 0.85, power transmission and transformation project of the professional adjustment factor of 1.2.
  • 匿名
2013-05-23 12:23:18
In the above part of the project cost for the direct costs, and rates the difficulty factor of 0.85 and professional adjustment factor to 1.2 for power projects.
  • 匿名
2013-05-23 12:24:58
Serves as the cost volume by the above various part of project construction cost flat cost, takes the difficulty coefficient is 0.85, the specialized regulation factor delivers changes the electricity project is 1.2.
  • 匿名
2013-05-23 12:26:38
To all of the above part of the direct cost of construction cost for billing amount, and difficulty coefficient of 0.85, professional adjustment coefficient of power transmission and transformation project for 1.2.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭