当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对于岩溶地下水发育路段,为防止钻孔过程中土体坍塌及大面积降低地下水位造成周边构筑物的沉降,拟设置旋喷桩支护止水帷幕是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对于岩溶地下水发育路段,为防止钻孔过程中土体坍塌及大面积降低地下水位造成周边构筑物的沉降,拟设置旋喷桩支护止水帷幕
问题补充:

  • 匿名
2013-05-23 12:21:38
Karst groundwater development sections, in order to prevent the drilling process of Turkey the body collapse and a large area of ​​lower groundwater levels caused by the subsidence of the surrounding structures, the proposed establishment of the jet grouting pile retaining waterproof curtain
  • 匿名
2013-05-23 12:23:18
For karst groundwater development sections, in order to prevent hole collapse in Turkey and a large lower the groundwater levels resulting from the settlement structure around, swing set boom support piles for the water curtain
  • 匿名
2013-05-23 12:24:58
Regarding the karst ground water growth road section, for prevented in the drill hole process soil body caving in and the big area ground water lowering creates the peripheral construction the subsidence, plans to establish turns on lathe spurts the pile supports and protections to stop the water cu
  • 匿名
2013-05-23 12:26:38
Development of karst groundwater in sections, large area to prevent borehole collapse of the soil and reducing water table caused settlement of the surrounding structures, proposed establishment of Rotary Jet Grouting pile retaining water-stop curtain
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭