当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:基础处出现规模较大的溶洞(溶洞高度≥10m,跨度<50m),宜采取适当调整塔位或改变跨径的方案。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
基础处出现规模较大的溶洞(溶洞高度≥10m,跨度<50m),宜采取适当调整塔位或改变跨径的方案。
问题补充:

  • 匿名
2013-05-23 12:21:38
Basis at the larger cave (the cave height ≥ 10m span <50m), should take the appropriate adjustment to the tower bit or change the program of the span.
  • 匿名
2013-05-23 12:23:18
At the base of the larger caves (caves 10 m height, SPAN or <50 M) and to take appropriate adjustment or change the position of the cross-track program.
  • 匿名
2013-05-23 12:24:58
The foundation place appears the scale big limestone cave (limestone cave highly ≥10m, span <50m), adopts the appropriate readjustment tower position or the change span plan suitably.
  • 匿名
2013-05-23 12:26:38
Appears based on the larger of the cave (cave height ≥ 10m, span <50m) should take the appropriate adjustment or change the span of the programme.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭