求翻译:the proposed hydroelectric power station is designed to be of a run of river type having a regulating pondage. in the first stage, one unit of 4,950 kw it will be installed to comply with a gross head of 70 m and the maximum discharge of 8.0 m3\s, which in the second stage, one more 4,950kw unit will be installed with 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
the proposed hydroelectric power station is designed to be of a run of river type having a regulating pondage. in the first stage, one unit of 4,950 kw it will be installed to comply with a gross head of 70 m and the maximum discharge of 8.0 m3\s, which in the second stage, one more 4,950kw unit will be installed with
问题补充:

  • 匿名
2013-05-23 12:21:38
建议的水力发电站的设计是一个河流类型有调节蓄水量的运行。在第一阶段,一个单位4,950千瓦,将安装符合毛水头70米,最大排水量8.0立方米\ S,在第二阶段,一个4,950 kW的单位将被安装最大排放8.0立方米\秒和第三阶段,花药4,950千瓦,将安装一个单独压力钢管的最大排放8.0立方米。最终装机容量将因此14.850千瓦,输出将发送到公河省和Attapeu省时的要求达到的水平
  • 匿名
2013-05-23 12:23:18
拟议的水力发电站的设计是一个运行的河型pondage有规管。 在第一阶段,一个单元的赃款四千九百五十KW将会安装它,遵守一头毛额的70米,最高的排放8.0M3\s,在第二阶段,一个更四千九百五十KW股将装有最大的排放8.0M3\s。 和第三阶段,花药四千九百五十KW将装有最大的排放8.0M3的单独给水栓。
  • 匿名
2013-05-23 12:24:58
提出的水力发电的驻地被设计是河类型奔跑有一调控的pondage。 在初级, 4,950千瓦一个单位将安装它遵照70 m一个总头,并且8.0 m3s最大放电,在第二阶段,一个多4,950kw单位将安装以8.0 m3s最大放电。 并且第三级,花药4,950千瓦将安装以最大放电8.0 m3由分开的笔杆。 最后的安装的容量将因而是14.850千瓦,并且产品将被传达给Sekong省和Attapeu省,当要求到达对水平
  • 匿名
2013-05-23 12:26:38
拟议的水电站被为了能够运行的河流类型有调节调蓄。在第一阶段,一个单位的 4,950 千瓦,它将被安装为 70 米的总团长和 8.0 m3\s,这在第二阶段,一个更多 4,950kw 股将是最大排放符合安装 8.0 m3\s 和第三阶段,花药 4,950 最大排水量 8.0 货币供应 m3 的最大流量将由单独的压力钢管安装 kw。最后安装的容量会因此 14.850 千瓦和输出会被传送到西省和阿速坡省,当需求正接近水平
  • 匿名
2013-05-23 12:28:18
建议的水力发电站的设计是一个河流类型有调节蓄水量的运行。在第一阶段,一个单位4,950千瓦,将安装符合毛水头70米,最大排水量8.0立方米\ S,在第二阶段,一个4,950 kW的单位将被安装最大排放8.0立方米\秒和第三阶段,花药4,950千瓦,将安装一个单独压力钢管的最大排放8.0立方米。最终装机容量将因此14.850千瓦,输出将发送到公河省和Attapeu省时的要求达到的水平
 
 