当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:in the final stage, the power plant will be expanded stepwise in accordance with the power demand\supply balance. all civil structures (including penstock and powerhouse) are to be completely bulit at the initial stage of final stage and only 4,950 kw turbine and generator are assumed to be installed at the second stag是什么意思?

待解决 悬赏分:1 - 离问题结束还有
in the final stage, the power plant will be expanded stepwise in accordance with the power demand\supply balance. all civil structures (including penstock and powerhouse) are to be completely bulit at the initial stage of final stage and only 4,950 kw turbine and generator are assumed to be installed at the second stag
问题补充:

  • 匿名
2013-05-23 12:21:38
在最后阶段,将扩大电厂,逐步按照\供需平衡的电力需求。所有土木结构(包括压力管道和厂房)在最后阶段的初始阶段,要完全bulit只有4,950千瓦的水轮机和发电机都被假定为安装在第二阶段和第三的最后阶段
  • 匿名
2013-05-23 12:23:18
在最后阶段,电力厂将逐步扩大根据的电力需求\供求平衡。 所有公民结构(包括给水栓和强国)将会完全比利在初步阶段的最后阶段,只有4 950名kW涡轮机和发电机被假定为是安装在第二阶段和第三阶段的最后
  • 匿名
2013-05-23 12:24:58
进入最后阶段,能源厂将被扩展stepwise与力量demandsupply平衡符合。 所有民用结构(包括笔杆和大力士)是完全是bulit在最后阶段和仅4,950千瓦涡轮最初的阶段和发电器假设安装在最后阶段的第二阶段和三
  • 匿名
2013-05-23 12:26:38
在最后阶段,将按照 demand\supply 均势逐代扩大电厂。所有民用建筑结构 (包括压力钢管和厂房) 是初始阶段的最后阶段将完全造,只有 4,950 千瓦汽轮机和发电机被假定为已安装了第二阶段和第三的最后阶段
  • 匿名
2013-05-23 12:28:18
在最后阶段,将扩大电厂,逐步按照\供需平衡的电力需求。所有土木结构(包括压力管道和厂房)在最后阶段的初始阶段,要完全bulit只有4,950千瓦的水轮机和发电机都被假定为安装在第二阶段和第三的最后阶段
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭