求翻译:several alternative scales for the Xe Namnoy project were proposed in previous plans and in this study (the study). the idea of the previous plans (JICA Masterplan 1994) to develop Xe Namnoy downstream HPP is to convey water from the same intake location through out long tunnel qpproximately 5 km to the power house loc是什么意思?

待解决 悬赏分:1 - 离问题结束还有
several alternative scales for the Xe Namnoy project were proposed in previous plans and in this study (the study). the idea of the previous plans (JICA Masterplan 1994) to develop Xe Namnoy downstream HPP is to convey water from the same intake location through out long tunnel qpproximately 5 km to the power house loc
问题补充:

  • 匿名
2013-05-23 12:21:38
在先前的计划,在这项研究中提出几种替代尺度XE Namnoy项目(研究)。以前的计划(JICA的总体规划1994)发展XE Namnoy下游HPP的想法是要传达出长长的隧道,qpproximately 5公里,位于脚下的山附近的Xenamnoy河发电厂房,从相同的摄入位置,通过水,头部近70米,可在约30兆瓦的发电厂房这个计划似乎是不经济的,由于长隧道,工程造价极高。因此,这个想法被放弃
  • 匿名
2013-05-23 12:23:18
[object Object]
  • 匿名
2013-05-23 12:24:58
几个供选择的标度为Xe Namnoy项目提议在早先计划和在这项研究(研究)中。 早先计划(JICA Masterplan的想法1994)开发Xe Namnoy顺流HPP是通过长的隧道转达水从同一个进水闸地点qpproximately 5公里对力量房子位于山的脚近由Xenamnoy河,力量房子兆瓦可以由头几乎70 m.得到的大约30。 这份计划似乎不经济归结于长的隧道,项目费用极端高。 因而,放弃了这个想法
  • 匿名
2013-05-23 12:26:38
几种备选标度 Xe Namnoy 项目提出了先前的计划中,并在这项研究 (研究)。先前的计划 (JICA 总纲计划 1994 年) 发展 Xe Namnoy 下游水电站的想法是传达从相同的进水口位置通过了 5 公里长的隧道 qpproximately 厂房位于山脚附近由 Xenamnoy 河的水,在力量房约 30 mw 可获得近 70 m.这个计划似乎是不经济的长隧道因头部项目成本是极高。因此,这种想法是放弃了
  • 匿名
2013-05-23 12:28:18
在先前的计划,在这项研究中提出几种替代尺度XE Namnoy项目(研究)。以前的计划(JICA的总体规划1994)发展XE Namnoy下游HPP的想法是要传达出长长的隧道,qpproximately 5公里,位于脚下的山附近的Xenamnoy河发电厂房,从相同的摄入位置,通过水,头部近70米,可在约30兆瓦的发电厂房这个计划似乎是不经济的,由于长隧道,工程造价极高。因此,这个想法被放弃
 
 