当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:b) The determination of the charge arrangement length along the embankment: mainly according to the daily charge arrangement capacity and safety requirements, the charge arrangement length is increased as possible in principle to enlarge the once destressing area and to decrease the clamping action from both sides of 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
b) The determination of the charge arrangement length along the embankment: mainly according to the daily charge arrangement capacity and safety requirements, the charge arrangement length is increased as possible in principle to enlarge the once destressing area and to decrease the clamping action from both sides of
问题补充:

  • 匿名
2013-05-23 12:21:38
二)负责安排长的沿大堤的决心:主要是根据每天负责安排能力和安全性的要求,负责安排长度增加原则上尽可能放大一次去应力区,并减少从两侧夹紧动作在去应力区充填体的岩石路基,NTO在爆破去应力提高的替代效应。工作艇在海上定位在负责这个项目的安排,负责加载紧迫的方法用挖掘机施工效率低。
  • 匿名
2013-05-23 12:23:18
b)的费用安排的决心沿着堤岸长度:主要是根据每日费用安排能力和安全要求,而增加的费用安排长度原则上可将其放大后的区域destressing夹紧作用,减少双方的大堤的填的岩石在destressing区域机构,n的替代效应在爆破destressing改善。
  • 匿名
2013-05-23 12:24:58
b)充电安排长度的决心沿堤防: 在炸开的destressing期间,主要根据每日充电安排容量和安全需要,充电安排长度在destressing的区域被增加尽可能原则上扩大一次destressing的区域和减少夹紧的行动从堤防的两边对岩石填装的身体,不改进替换作用。 充电安排在这个项目由workboat在海安置,并且充电使用按方法被装载由挖掘者用低建筑效率。
  • 匿名
2013-05-23 12:26:38
b) 沿堤防的收费安排长度的确定: 主要是根据每日收费安排能力和安全要求,收费安排长度增加尽可能原则上以放大的一次 destressing 区域并减少夹行动从两侧的路堤填筑 destressing 地区的身体、 nto 爆破卸压期间提高置换效果。在此项目中的收费安排位于由工作船在海中与收费用压法由加载挖掘机具有低的施工效率。
  • 匿名
2013-05-23 12:28:18
b ) 沿着筑堤的费用安排长度的决心:主要根据日常费用安排能力和安全要求,费用安排长度被增强如可能原则上放大曾经撤销强调地区,减少来自对于在撤销强调地区的岩石充填物身体的筑堤的边的夹住行动, nto 在炸撤销强调期间改善替代效果。这个项目中的费用安排在海和费用被 workboat 放置使用通过有低建造效率的挖掘者按方法被装载。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭