求翻译:The Contractor shall submit, in the detailed schedule submittal 50 percent off-site fabrication milestones for two completion dates as specified in Section 01110-Summary of Work, Paragraphs 1.04 B.2 and 1.04 B.4 of the off-site fabrication cativities for the components of the following pumps respectively是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall submit, in the detailed schedule submittal 50 percent off-site fabrication milestones for two completion dates as specified in Section 01110-Summary of Work, Paragraphs 1.04 B.2 and 1.04 B.4 of the off-site fabrication cativities for the components of the following pumps respectively
问题补充:

  • 匿名
2013-05-23 12:21:38
承建商须提交详细的时间表提交50%的异地制造的里程碑,完工日期第01110汇总工作的规定,第1.04 B.2和1.04的场外制作活动。21。Colorado。Plains B.4为分别以下泵组件
  • 匿名
2013-05-23 12:23:18
承包者应提交详细的时间表提交50%的站点制作完成后两个阶段的第节中所规定日期01110-工作的摘要,第1.04和1.04b4b2的非现场的部件制造cativities分别以下泵
  • 匿名
2013-05-23 12:24:58
承包商在详细的日程表submittal 50%现场之外的制造里程碑在工作、段1.04 B.2和现场之外的制造cativities的1.04 B.4部分01110总结将递交,二个完成日期如指定为各自以下泵浦的组分
  • 匿名
2013-05-23 12:26:38
承建商应提交,在详细的附表提交 50%非现场制作里程碑的下列泵的组件所指明的部分 01110 总结工作、 段落 1.04 B.2 和 1.04 B.4 异地制作 cativities 的两个完成日期分别
  • 匿名
2013-05-23 12:28:18
承包商将屈服,在详细时间表中两完成的 submittal 50% 非实地装配工里程碑记载日期如指定在工作,第 1.04 段 B.2 和 1.04 非实地装配工的 B.4 的第 01110 节- Summary 中对于以下水泵的组件的 cativities 分别地
 
 