当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:违反3中所述评估条件,或更改设计和制造过程质量体系文件的行为可能导致本评估报告失效。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
违反3中所述评估条件,或更改设计和制造过程质量体系文件的行为可能导致本评估报告失效。
问题补充:

  • 匿名
2013-05-23 12:21:38
The behavior described in violation of three evaluation criteria, or change the design and manufacturing process quality system documents may result in failure of the assessment report.
  • 匿名
2013-05-23 12:23:18
In 3 of the evaluation criteria, or change the design and manufacturing process of the quality system documentation may result in the assessment report.
  • 匿名
2013-05-23 12:24:58
Violates in 3 to state the appraisal condition, or the change designs and makes the process quality system document the behavior possibly to cause this appraisal report expiration.
  • 匿名
2013-05-23 12:26:38
3 violations described in the evaluation criteria, or change the design and manufacturing process quality system file may disable this assessment.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭