当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:其中:A是墙后填土主动土压力xishu,B是整个断面的重心至墙趾的距离,Z是墙后填土主动土压力作用点位置。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
其中:A是墙后填土主动土压力xishu,B是整个断面的重心至墙趾的距离,Z是墙后填土主动土压力作用点位置。
问题补充:

  • 匿名
2013-05-23 12:21:38
Where: a backfill the active earth pressure, b is the distance of the center of gravity of the entire section to the wall toe, z is the position backfill the active earth pressure.
  • 匿名
2013-05-23 12:23:18
Where: A after Wall filling active earth pressure, and the entire cross-section B is the focus of the distance from the wall, a wall Z after filling active earth pressure role.
  • 匿名
2013-05-23 12:24:58
In which: After A is the wall the earth fill active thrust of earth, B is the entire cross section center of gravity to the wall foot distance, after Z is the wall the earth fill initiative earth-pressure point of force concurrence position.
  • 匿名
2013-05-23 12:26:38
Where: a is the active earth pressure of wall after filling, b is the distance between gravity and toe of the wall for the entire section, z is the role of active earth pressure of wall fill point.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭