求翻译:发电机配套半成品材料到现场是直接堆放在一起的,以至于我处在找材料、挑选材料的时候发生困难,直接和间接导致人员、机械窝工现象发生 :其中技术人工20人×3天=60工日,管理人员4人×3天=12工日;吊车配合50T×3天=3个台班是什么意思?

待解决 悬赏分:1 - 离问题结束还有
发电机配套半成品材料到现场是直接堆放在一起的,以至于我处在找材料、挑选材料的时候发生困难,直接和间接导致人员、机械窝工现象发生 :其中技术人工20人×3天=60工日,管理人员4人×3天=12工日;吊车配合50T×3天=3个台班
问题补充:

  • 匿名
2013-05-23 12:21:38
Generator supporting the semi-finished materials to the site is directly stacked together, that I am in looking for materials, selection of materials difficult, resulting in direct and indirect, mechanical work slowdown phenomenon: the technology of artificial 20 × 3 days = 60 man-days, managers × 3
  • 匿名
2013-05-23 12:23:18
Generators with semi-finished products to the site is a direct material piled up on the, to the extent that I found in the selection of materials, and materials of the time, there are difficulties caused directly and indirectly, mechanical schedule slippage occurs: the Technical Manual 20 X 3 days =
  • 匿名
2013-05-23 12:24:58
The generator necessary half-finished product material to the scene is piles up directly in together, I occupy looks for the material, choice material time have the difficulty, direct and causes the personnel, the machinery to sabotage work indirectly the phenomenon occurrence: Technical artificial
  • 匿名
2013-05-23 12:26:38
Generator supporting the semi-finished materials to the scene is directly stacked together, so that when I am in found materials, the selection of material difficulties, both directly and indirectly causing, mechanical idling occurred: technical manual 20 X3 days = 60 shadow days, management staff,
  • 匿名
2013-05-23 12:28:18