求翻译:初步设计按计划于2005年10月15日完成,并通过电力规划设计总院及中国国际工程咨询公司组成的专家组的审查。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
初步设计按计划于2005年10月15日完成,并通过电力规划设计总院及中国国际工程咨询公司组成的专家组的审查。
问题补充:

  • 匿名
2013-05-23 12:21:38
Preliminary design plans to be completed by October 15, 2005, and review by the Expert Group by the Electric Power Planning and Design Institute and the China International Engineering Consulting Corporation.
  • 匿名
2013-05-23 12:23:18
Preliminary design scheduled to October 15, 2005, complete with power planning and design institute and the China International engineering consulting firm comprised of the review of the Expert Group.
  • 匿名
2013-05-23 12:24:58
The preliminary design completes according to the plan in October 15, 2005, and designs expert group's examination through the electric power plan which the main hospital and Chinese International Project Consultant firm composes.
  • 匿名
2013-05-23 12:26:38
Preliminary design was completed on October 15, 2005 as planned, and through power planning and Design Institute, and the China International engineering consulting company review of the composition of the Group of experts.