|
关注:1
2013-05-23 12:21
求翻译:b、冷凝水的排水位置应根据施工图合理布管。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
b、冷凝水的排水位置应根据施工图合理布管。
问题补充: |
|
2013-05-23 12:21:38
b, condensate drain location should be reasonable piping construction drawings.
|
|
2013-05-23 12:23:18
B, condensate drainage position should be based on the project reasonable.
|
|
2013-05-23 12:24:58
b, the condensed water draining water position should act according to the construction drawing reasonable cloth tube.
|
|
2013-05-23 12:26:38
B, condensed water drainage position should be based on construction drawings reasonable cloth.
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区