当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:按照企业和项目的质量方针和质量目标开展质量管理工作, 在横向开展各个有关部门,纵向分解到每个作业点, 做到纵向衔接,横向协调。在施工难度大、质量要求高的部位如:防爆设备、防静电接地、冷水机组安装、空调箱安装、多联机安装的施工等等,施工前由质量员、技术员给施工班组开质量交底会 。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
按照企业和项目的质量方针和质量目标开展质量管理工作, 在横向开展各个有关部门,纵向分解到每个作业点, 做到纵向衔接,横向协调。在施工难度大、质量要求高的部位如:防爆设备、防静电接地、冷水机组安装、空调箱安装、多联机安装的施工等等,施工前由质量员、技术员给施工班组开质量交底会 。
问题补充:

  • 匿名
2013-05-23 12:21:38
Quality control work carried out in accordance with corporate and project quality policy and quality objectives, carry out the various departments in the horizontal and vertical decomposition of each operating point, and vertical convergence and horizontal coordination. Difficulty in construction, h
  • 匿名
2013-05-23 12:23:18
In accordance with corporate guidelines and the quality of projects and quality objectives for quality management in the side-by-side, in the various departments, and the longitudinal split to each job, and do vertical convergence, horizontal coordination. It is very difficult in construction, quali
  • 匿名
2013-05-23 12:24:58
According to the enterprise and the project quality policy and the quality goal development quality control work, crosswise is developing each department concerned, the longitudinal decomposition to each work spot, achieves the longitudinal engagement, lateral coordination.In construction difficulty
  • 匿名
2013-05-23 12:26:38
In accordance with the enterprise and project quality management work of quality policy and quality objectives, all the relevant departments in the horizontal, vertical down to each job, do convergence vertical and horizontal coordination. Construction was difficult, requires high-quality parts such
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭