当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Before grouting, move pipe caps of both ends was moved, and then pipe inner wall was coated with lubrication oil. After that, combining the two parts of pipe,installing both ends and using three-four streng then laryngeal hoops to improve pipe combination. After turning on grouting equipment, connecting grouting gun to是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Before grouting, move pipe caps of both ends was moved, and then pipe inner wall was coated with lubrication oil. After that, combining the two parts of pipe,installing both ends and using three-four streng then laryngeal hoops to improve pipe combination. After turning on grouting equipment, connecting grouting gun to
问题补充:

  • 匿名
2013-05-23 12:21:38
灌浆前,移动两端被移动的管帽,管内壁涂上润滑油。之后,管相结合的两个部分,安装两端和使用3个高等教育要加强喉箍,以提高管道组合。打开后注浆设备,注浆枪注浆头直接连接,控制注浆量和生产不同密度的标本。
  • 匿名
2013-05-23 12:23:18
灌浆前,将管护罩的两端被移走,然后管道内壁涂有润滑的油。 在这之后,二者的结合部分的管道,安装两个目的和使用有三、四名然后喉箍加强改善管组合。 打开后灌浆设备,连接灌浆灌浆头枪,直接和产生不同密度的标本量控制的灌浆。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
注浆之前, 移动管帽两端的感动,然后管内壁都涂上了润滑油。之后,相结合管、 安装两端和使用三-四增强然后喉箍提高管相结合的两个部分。后注浆设备、 直接连接到灌浆头的注浆枪和生产不同密度的标本的灌浆的总量控制。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭