当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:是否有相关的检查制度能够保证整个灌装流程的合规性,对于所有涉及到灌装操作的设备部件,如:车辆、ISO TANK、罐箱底部的阀门接头、管道、灌装连接的接头金属软管等,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
是否有相关的检查制度能够保证整个灌装流程的合规性,对于所有涉及到灌装操作的设备部件,如:车辆、ISO TANK、罐箱底部的阀门接头、管道、灌装连接的接头金属软管等,
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
Whether has the correlation censorship to be able to guarantee entire fills installs the flow the compliance, regarding all involves to fills installs the operation the equipment component, for example: The vehicles, ISO TANK, the pot box base valve attachment, the pipeline, fill install the connect
  • 匿名
2013-05-23 12:26:38
For related inspection system to ensure that the entire filling process of compliance for all involves the filling operation of equipment parts, such as: cars, ISO TANK, tank bottom valve connector, pipes, filling attachment metal vlexible hose,
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭