求翻译:1.合理安排施工班组,配备充足的施工人员,分区域控制,将施工区域分成四块施工区域有101~102,103~105,106,107~108及室外,其中106由于有土建施工周期长,后期又有装饰配合为本项目控制主要点;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1.合理安排施工班组,配备充足的施工人员,分区域控制,将施工区域分成四块施工区域有101~102,103~105,106,107~108及室外,其中106由于有土建施工周期长,后期又有装饰配合为本项目控制主要点;
问题补充:

  • 匿名
2013-05-23 12:21:38
Reasonable arrangements for the construction team, with plenty of construction workers, sub-regional control, construction area is divided into four construction areas 101 ~ 102,103 ~ 105,106,107 ~ 108 and outdoor, which 106 civil construction cycle is long, decorated with the late stage control the
  • 匿名
2013-05-23 12:23:18
1.arrange construction crew, and equipped with plenty of construction personnel, sub-regional control, construction area will be divided into 4 regions with a block under construction 101 ~102,103 ~105,106,107 ~ 108 and 106 of them outside, because there is a long construction period, and during the
  • 匿名
2013-05-23 12:24:58
1. reasonable arrangement construction teams and groups, provides the sufficient constructor, divides the region control, will construct the region to divide into four construction regions to have 101~102,103~105,106,107~108 and outside, in which 106 because will have the construction to construct t
  • 匿名
2013-05-23 12:26:38
1. reasonable arrangements for the construction team, equipped with adequate personnel, the subregional control, construction area into four construction of regional 101~102,103~105,106,107~108 and outdoor, 106 of them because of the long construction period, later with decorative tie in with the co
  • 匿名
2013-05-23 12:28:18
1 reasonable arrangements for construction crew, and equipped with plenty of construction personnel, sub-regional control and Construction area will be divided into 4 regions with a block under construction 101 ~102,103 ~105,106,107 ~ 108 and 106 of them outside, because there is a long construction
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭