当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:is supplied at two stages such as an initial standby water level and later full water level ,wherein during supplying water to the full water level ,air transference method using hydrodynamic operation occurred from a high speed injection with a injection nozzle is used without electric energy是什么意思?

待解决 悬赏分:1 - 离问题结束还有
is supplied at two stages such as an initial standby water level and later full water level ,wherein during supplying water to the full water level ,air transference method using hydrodynamic operation occurred from a high speed injection with a injection nozzle is used without electric energy
问题补充:

  • 匿名
2013-05-23 12:21:38
在两个阶段,如初始的待机水位和后来水位期间供水充分水位,其中,提供从与喷嘴高速喷射,空气转移的方法,利用水力操作发生时无需电能
  • 匿名
2013-05-23 12:23:18
在两个阶段提供一个初始待机等水满水一级水平,后来,其中供水期间满水一级,空气转移方法,采用流体力学原理发生了非常高的注射速度,喷油嘴不使用电力能源
  • 匿名
2013-05-23 12:24:58
被供应在二个阶段例如最初的备用水平面,并且最新充分的水平面,在供应的水期间对充分的水平面,空气转让方法使用水力操作从高速射入发生了与射入喷管使用,不用电能
  • 匿名
2013-05-23 12:26:38
提供初始待机水位和稍后满水位,其中供水满水位,期间空气迁移方法使用动力操作发生从高两阶段速度注射用喷油嘴用于无电能量
  • 匿名
2013-05-23 12:28:18
在两个阶段提供例如最初备用水位及较迟全部水位,在提供水给全部水位的过程中的原因,空气使用水力的操作的 transference 方法来自有注射管口的高速注射出现没有电气能量地被使用
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭