当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:为了更好地了解桩基荷载的影响,计算过程中对3个点的位移进行了监测,分别是1号点(桩底)、2号点(溶洞顶板)和3号点(溶洞侧壁)。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
为了更好地了解桩基荷载的影响,计算过程中对3个点的位移进行了监测,分别是1号点(桩底)、2号点(溶洞顶板)和3号点(溶洞侧壁)。
问题补充:

  • 匿名
2013-05-23 12:21:38
To better understand the impact of pile load calculation process three point displacement monitoring, respectively, on the 1st point (pile bottom), points (on the 2nd cave roof) and No. 3 (cave sidewalls) .
  • 匿名
2013-05-23 12:23:18
In order to better understand the impact pile load calculations, and in the process of the 3-point shift, respectively, the monitoring is number 1 (piles), the No. 2 point (top) and cave No. 3 points (caves side wall).
  • 匿名
2013-05-23 12:24:58
In order to understood well the pile foundation load the influence, in the computation process has carried on the monitor to 3 spot displacements, respectively is 1 spot (pile bottom), 2 spots (limestone cave roof) and 3 spots (limestone cave sidewall).
  • 匿名
2013-05-23 12:26:38
In order to better understand the impact of load capacity of pile, 3 points calculation process monitor displacement, namely point 1th (pile), 2nd (cave roof) and 3rd points (cave side wall).
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭