当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在软土地基处理方法中,出现了一种代替振冲碎石桩的新的施工方法,这就是振动沉管挤密碎石桩。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在软土地基处理方法中,出现了一种代替振冲碎石桩的新的施工方法,这就是振动沉管挤密碎石桩。
问题补充:

  • 匿名
2013-05-23 12:21:38
In the soft ground, there has been an alternative to vibro replacement stone column construction method, which is the vibro compacted gravel pile.
  • 匿名
2013-05-23 12:23:18
In the soft land-based approach, there have been a substitute for the hedge gravel piles of new construction methods, and this is the congested key vibration sunken gravel pile.
  • 匿名
2013-05-23 12:24:58
In the soft soil ground processing method, appeared one kind to replace inspires flushes the garrulous stone marker the new job practice, this was vibrates the settling tube to push the dense garrulous stone marker.
  • 匿名
2013-05-23 12:26:38
In soft soil Foundation treatment method, there has been an alternative to new construction of vibro-replacement gravel pile method, which is vibration sinking gravel compaction pile.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭