当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:针对本标段工程工期短,同期施工工点较为分散,施工人员和机械设备繁杂等特点,为加强组织,统一调配,满足文明施工,实行集中管理。施工现场的施工布置原则为“封闭、集中、高效”。按照企业文化形象要求规范化设置和管理施工现场。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
针对本标段工程工期短,同期施工工点较为分散,施工人员和机械设备繁杂等特点,为加强组织,统一调配,满足文明施工,实行集中管理。施工现场的施工布置原则为“封闭、集中、高效”。按照企业文化形象要求规范化设置和管理施工现场。
问题补充:

  • 匿名
2013-05-23 12:21:38
The tenders for the construction period is short, period of construction work sites are more scattered, complex construction and machinery and equipment, etc., in order to strengthen the organization, unified deployment, to meet the civilized construction, centralized management. Layout of the const
  • 匿名
2013-05-23 12:23:18
Tenders for the construction works for the same period and short construction period is more decentralized, and the construction personnel and machinery equipment such as animated features, to strengthen the Organization, meet civilization, and deploy them in a unified, centralized management works.
  • 匿名
2013-05-23 12:24:58
Is short in view of this sign section project time limit for a project, constructs the labor spot to be dispersible same time, constructor and mechanical device numerous and diverse and so on characteristics, is the enhancement organization, the unification mixes, satisfies the civilized constructio
  • 匿名
2013-05-23 12:26:38
Section short project duration, over construction point more dispersed and construction staff and mechanical equipment complex features, to strengthen organization, unified provisioning to meet construction, implement centralized management. Construction of construction site layout as "closed, centr
  • 匿名
2013-05-23 12:28:18
This section of short project duration, over construction point fragmented, complex construction personnel and machinery, and other characteristics, to strengthen the Organization, the unified deployment, meet civilized construction, centralized management. Construction of construction site layout a
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭