当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本工程吊装时采用多吊点。起吊和平移应缓慢。现场吊装采取单片吊装校正后逐片安装,临时缆风绳采用拉条固定是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本工程吊装时采用多吊点。起吊和平移应缓慢。现场吊装采取单片吊装校正后逐片安装,临时缆风绳采用拉条固定
问题补充:

  • 匿名
2013-05-23 12:21:38
This project more than lifting point when lifting. Lifting and translation should be slow. The site hoisting take the monolithic lifting corrected by piece to install temporary wind cable rope brace fixed
  • 匿名
2013-05-23 12:23:18
This works when you lift the more lift points. Lifting the peace movement should be slow. On-site lifting by lifting single-chip-chip installed After correction, the cable-rope with drop-down bar fixed
  • 匿名
2013-05-23 12:24:58
When this project hoisting uses hangs the spot.The hoisting up and the translation should be slow.After the scene hoisting adopts the monolithic hoisting to adjust by the piece installment, the temporary cable wind rope uses the brace to be fixed
  • 匿名
2013-05-23 12:26:38
This work when lifting and hanging on the point. Lifting and pan should be slow. Onsite hoisting hoisting after correction of single-chip-by-chip installed, the temporary cable wind rope pull fixed
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭