当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对本工程的施工任务按工程类别进行划分,分别配备相应的专业施工队伍进行施工。本项目具体各分项工程的工程数量及类别情况及各工班施工任务安排情况如下:是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对本工程的施工任务按工程类别进行划分,分别配备相应的专业施工队伍进行施工。本项目具体各分项工程的工程数量及类别情况及各工班施工任务安排情况如下:
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction of this project be divided by type of construction tasks, respectively, with the appropriate professional construction team for construction. The project specific sub-project engineering work and the number and type of construction task scheduling classes as follows:
  • 匿名
2013-05-23 12:23:18
For the construction of the engineering tasks, broken down by type of construction are equipped with corresponding professional construction team works carried out. This project specifically the sub-project, project number and types of cases and the various industries and construction tasks on arran
  • 匿名
2013-05-23 12:24:58
Carries on the division to this project construction duty according to the project category, provides the corresponding specialized construction troop to carry on the construction separately.This project concrete various sub-items project project quantity and the category situation and various labor
  • 匿名
2013-05-23 12:26:38
On engineering construction broken down by type of construction, equipped with the appropriate professional construction teams respectively for the construction. This project specific sub-item engineering of engineering quantity and categories and by class construction schedule as follows:
  • 匿名
2013-05-23 12:28:18
On engineering construction broken down by type of construction, equipped with the appropriate professional construction teams respectively for the construction. The project specific sub-item project construction works number and type of situation and of the public class schedule is as follows:
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭