当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:二次滤网自动投入后,系统将按照设计程序自动进行排污,并且按照设定时间自动循环运行(具体时间设定根据实际运行要求而定)。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
二次滤网自动投入后,系统将按照设计程序自动进行排污,并且按照设定时间自动循环运行(具体时间设定根据实际运行要求而定)。
问题补充:

  • 匿名
2013-05-23 12:21:38
Automatically into the second filter, the system will automatically discharge in accordance with the design process, and automatic cycle operation in accordance with set time (time set according to actual operating requirements).
  • 匿名
2013-05-23 12:23:18
2 times automatically input filter, the system will automatically in accordance with the design procedure for sewage, and in accordance with set time cycle automatically run (specific time setting based on the actual operational requirements.
  • 匿名
2013-05-23 12:24:58
After two mesh automatic investments, the system will defer to the design procedure to carry on the pollution discharge automatically, and (concrete time hypothesis basis actual movement request will decide) according to the hypothesis time autocycle movement.
  • 匿名
2013-05-23 12:26:38
Second filter automatically after input, automatically sewage systems by design program and set time automatically loops run (set specific time determined according to actual operational requirements).
  • 匿名
2013-05-23 12:28:18
After the second filter automatically inputs, the system will auto emissions by design program, and in accordance with set time automatically loops run (set at a specific time based on actual operational requirements may be).
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭