当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:3楼、地面基层或面层施工时,必须用木塞或水泥纸将地漏或水池管口临时封闭,严防水泥砂浆和杂物坠入管内堵塞管道,影响排水。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
3楼、地面基层或面层施工时,必须用木塞或水泥纸将地漏或水池管口临时封闭,严防水泥砂浆和杂物坠入管内堵塞管道,影响排水。
问题补充:

  • 匿名
2013-05-23 12:21:38
3rd floor, ground or surface layer of grass-roots construction, cement, paper must be cork or floor drain or sink to the temporary closure of the nozzle to prevent cement mortar and debris fall into the pipe plug pipe, affect drainage.
  • 匿名
2013-05-23 12:23:18
3 And on the ground floor at grass-roots or surface layer, and must be carried out with a wooden plug or cement paper will Ground leakage or pool pipe temporary closure, to guard against cement mortar and debris from falling into the interior of the pipe plug pipelines, affect drainage.
  • 匿名
2013-05-23 12:24:58
When 3 buildings, ground basic units or surface layer construction, must use the wooden cork either the cement paper the floor drain or the basin orifice temporary seal, takes strict precautions against the cement mortar and the sundry goods crashes into in the tube to stop up the pipeline, affects
  • 匿名
2013-05-23 12:26:38
3/f, when ground or surface construction at the basic level, must be enclosed in a cork or paper cement floor drain or sink spout closed to prevent blocked pipeline in cement mortar and debris into the tube and affect drainage.
  • 匿名
2013-05-23 12:28:18
3/f, when ground or surface construction at the basic level, must be enclosed in a cork or paper cement floor drain or sink spout closed to prevent blocked pipeline in cement mortar and debris into the tube and affect drainage.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭