当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:BASS 公司确认21号去验货,但是我那段时间在福建(RTG),所以,验货时间必须推迟到七月。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
BASS 公司确认21号去验货,但是我那段时间在福建(RTG),所以,验货时间必须推迟到七月。
问题补充:

  • 匿名
2013-05-23 12:21:38
The bass company confirmed on the 21st to the inspection, but I have that time in Fujian (rtg), so the inspection time to be postponed to July.
  • 匿名
2013-05-23 12:23:18
BASS company has confirmed that 21 of the pallet to verify that, but I am all that time in Fujian (RTG), so that the time must be deferred until 7 months.
  • 匿名
2013-05-23 12:24:58
BASS Corporation confirmed 21 inspect goods, but my period of time in Fujian (RTG), therefore, the inspecting goods time must postpone in July.
  • 匿名
2013-05-23 12:26:38
BASS company confirms that the 21st inspection, but I that time in Fujian (RTG), therefore, the inspection time must be postponed until July.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭