当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:When required by the Project Manager the Contractor shall make arrangements for a comprehensive soil investigation to be carried out at any specified tower site, including deep borings and laboratory analysis of undisturbed soil samples and for a report and recommendation to be submitted as described under Special Foun是什么意思?

待解决 悬赏分:1 - 离问题结束还有
When required by the Project Manager the Contractor shall make arrangements for a comprehensive soil investigation to be carried out at any specified tower site, including deep borings and laboratory analysis of undisturbed soil samples and for a report and recommendation to be submitted as described under Special Foun
问题补充:

  • 匿名
2013-05-23 12:21:38
必要时由项目经理,承包人应当在任何指定的塔网站,包括深钻孔原状土样化验分析,并在特殊地基中所述的建议将提交一份报告,并进行了安排一个全面的土壤调查。项目经理可能需要,这项工作应进行费率批准的分包商同意。
  • 匿名
2013-05-23 12:23:18
所需的项目经理时,承包者应安排一个全面调查,研究土壤在任何指明塔站点,包括深钻孔和实验室分析土壤样本,并未受干扰的报告和建议中所述应提交特殊的基础。 项目经理可能需要,这项工作应由一个批准分包商的价格达成一致意见。
  • 匿名
2013-05-23 12:24:58
当由项目负责人时需要承包商将做安排为了为了报告和推荐能将执行的在所有指定的塔站点,包括对原状土样品的深刻的乏味和实验室分析和一次全面土壤调查能递交如所描述在特别基础之下。 项目负责人也许需要这工作将由批准的转承包商执行以将同意的率。
  • 匿名
2013-05-23 12:26:38
当项目经理要求承建商须作出全面的土壤调查任何指定的塔网站进行安排,包括深钻孔和实验室分析的原状的土样和提交特别的基础下所述的建议及报告。项目经理可规定须进行这项工作的速度得到同意核准承。
  • 匿名
2013-05-23 12:28:18
被项目经理需要时承包商将做出安排让一项全面的土壤调查在任何指定塔地点被进行,包括深钻孔和未受到干扰的土壤的实验室分析采样和一份报告和推荐信若要在特别的基础下根据说明被提交。项目经理可能要求这份工作将以费率被一名被赞同的分销商执行同意。
 
 