当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:All costs incurred in securing the necessary permissions, execution of the conditions or obligations attached to the permission during and after the execution of the works shall be borne by the Contractor.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
All costs incurred in securing the necessary permissions, execution of the conditions or obligations attached to the permission during and after the execution of the works shall be borne by the Contractor.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
有一些机构(即:-坎帕拉市议会权力下放问题,乌干达警察、国家公路局、乌干达铁路公司)负责交通流量管理在项目区。 这是一个要求的合同,工程的安全许可,承包商应在执行任何与这些机构工作过马路,以控制流量。
  • 匿名
2013-05-23 12:24:58
All costs incurred in securing the necessary permissions, execution of the conditions or obligations attached to the permission during and after the execution of the works shall be borne by the Contractor.
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭