当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Contractor shall locate the tower foundations from the tower centre point and shall perform all additional measurements necessary to facilitate construction. In particular, the Contractor shall measure the slope of the ground at each tower location and he shall, on the basis thereof, select and propose tower leg e是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall locate the tower foundations from the tower centre point and shall perform all additional measurements necessary to facilitate construction. In particular, the Contractor shall measure the slope of the ground at each tower location and he shall, on the basis thereof, select and propose tower leg e
问题补充:

  • 匿名
2013-05-23 12:21:38
承包人应当从塔顶中心点找到塔基础和应履行所有必要的额外的测量,施工方便。特别是,承包人应当在每个塔位置的地面坡度测量,及其在此基础上,他将选择和提出要求塔腿扩展。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
承包商将设置塔基础从塔中点,并且进行所有另外的测量必要促进建筑。 特别是,承包商将测量地面的倾斜在每个塔地点,并且他将,根据因此依据,选择和提出塔腿引伸如所需求。
  • 匿名
2013-05-23 12:26:38
承建商应找到从塔中心点塔基础,并须执行帮助建设所必需的所有额外测量。特别是,承建商应衡量每个塔位置在地面的斜率和他不得,在其基础上选择并建议塔腿扩展所需。
  • 匿名
2013-05-23 12:28:18
承包商将来自塔中心点使塔基础座落于和将实行所有其他的度量法有必要促进建造。尤其,承包商在每塔定位将测量地的斜坡和他将,在基础上其中,根据需要选择和提议塔腿扩大。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭