当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:3Raise also pointed out that the shipments are expected to be very limited at the first 3 months (July, August and September). The lead time within this period would be 12 weeks, because uBlox needs to take care of their bigger client first.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
3Raise also pointed out that the shipments are expected to be very limited at the first 3 months (July, August and September). The lead time within this period would be 12 weeks, because uBlox needs to take care of their bigger client first.
问题补充:

  • 匿名
2013-05-23 12:21:38
3raise还指出,出货量预计要在头3个月非常有限(七月,八月和九月)。在这段时间内的交货时间是12周,,因为ublox需要首先要照顾他们的大客户。
  • 匿名
2013-05-23 12:23:18
3抬起还指出,“出货量预计将会十分有限,在最初的3个月(7月、8月和9月)。 在这段期间内的时间将由12个星期,因为ublox需要照顾他们的大客户第一。
  • 匿名
2013-05-23 12:24:58
3Raise也指出发货预计是非常有限的在前3个月(7月、8月和9月)。 因为uBlox需要首先,照顾他们的更大的客户前置时间在这个期间内是12个星期。
  • 匿名
2013-05-23 12:26:38
3Raise 还指出出货量预计将在第一次 3 个月 (7 月、 8 月和 9 月) 是很有限。铅时间,在此期间内的将 12 周,因为 uBlox 需要首先照顾他们更大的客户端。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭