当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Contractor shall prepare and submit to the Project Manager for approval dimensioned general and detailed design drawings of all the structures. Drawings already submitted by the Contractor and approved by the Project Manager, and such drawings as shall be thereafter submitted by the Contractor and approved by the 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall prepare and submit to the Project Manager for approval dimensioned general and detailed design drawings of all the structures. Drawings already submitted by the Contractor and approved by the Project Manager, and such drawings as shall be thereafter submitted by the Contractor and approved by the
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭