当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对插桩与拔桩作业进行了风险辨识,建立了插桩作业中平台穿刺的事故树模型,并运用PHA方法对拔桩作业进行了风险分析;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对插桩与拔桩作业进行了风险辨识,建立了插桩作业中平台穿刺的事故树模型,并运用PHA方法对拔桩作业进行了风险分析;
问题补充:

  • 匿名
2013-05-23 12:21:38
Instrumentation pile pulling operations risk identification, Instrumentation job platform puncture fault tree model, risk analysis and the use of the pha job tension piles;
  • 匿名
2013-05-23 12:23:18
To remove the piles and piles of risk job, identify the piles had been established in the job of the venipuncture platform tree model, and an accident PHA methods used to remove piles conducted a risk analysis job.
  • 匿名
2013-05-23 12:24:58
To inserted the pile and the pile pulling work has carried on the risk identification, established inserted in the pile work the platform puncture accident tree model, and has carried on the risk analysis using the PHA method to the pile pulling work;
  • 匿名
2013-05-23 12:26:38
On insert pile and pile pulling job for risk identification, the establishment of a fault tree model of inserted pile platform puncture in the job, and using the method of PHA pulling job risk analysis;
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭