当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在坝踵部位沿坝轴线方向,挖除破碎岩石,直至遇到完整岩石(或相对不透水岩层),然后用混凝土坟塞,形 成截水墙。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在坝踵部位沿坝轴线方向,挖除破碎岩石,直至遇到完整岩石(或相对不透水岩层),然后用混凝土坟塞,形 成截水墙。
问题补充:

  • 匿名
2013-05-23 12:21:38
Excavation broken rock at the dam heel parts along the direction of the dam axis, until the encounter intact rock (or relatively impervious rock), then use the concrete grave plug, the formation of the cut-off wall of water.
  • 匿名
2013-05-23 12:23:18
As well as heel area along the dam axis and dug out the broken rock, until it encounters complete rock formations (or relative) overlain with concrete, and then the cemetery, into a wall of water shot.
  • 匿名
2013-05-23 12:24:58
In the dam heel spot along the dam spool thread direction, digs eliminates the stave rock, until meets the complete rock (or relatively waterproof rock stratum), then fills with the concrete grave, forms cuts.
  • 匿名
2013-05-23 12:26:38
Direction along the axis of the dam in dam heel position, dug in addition to crushed rock, until it encounters a full rock (or relatively impermeable strata) and graves with concrete plug, form a Barrier.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭