当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:随着水库蓄水位的增高,大坝和岩石的结合部形成渗流,导致大坝基础渗流段两次被冲毁,形成宽约40米的缺口。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
随着水库蓄水位的增高,大坝和岩石的结合部形成渗流,导致大坝基础渗流段两次被冲毁,形成宽约40米的缺口。
问题补充:

  • 匿名
2013-05-23 12:21:38
With the reservoir water level is increased, the junction of the dam and the rock formation of the seepage, dam foundation seepage segment twice destroyed, forming a gap width of 40 meters.
  • 匿名
2013-05-23 12:23:18
With the rising water level dam, Hoover Dam and the rock formation of the dam Foundation seepage of seeping twice destroyed, creating a wide gap of about 40 meters.
  • 匿名
2013-05-23 12:24:58
Along with the reservoir store water level markup, the dam and the rock intersection forms the transfusion, causes the dam foundation transfusion section two times to wash away, forms the width approximately 40 meters gaps.
  • 匿名
2013-05-23 12:26:38
As the high water level of the reservoir, and joint formation of rock seepage of the dam, resulting in dam Foundation seepage was twice destroyed, form a gap of about 40 meters wide.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭