当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:为降低坝体浸润线及孔隙压力,增加坝体稳定,下游坝脚部位增设堆石排水棱体。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
为降低坝体浸润线及孔隙压力,增加坝体稳定,下游坝脚部位增设堆石排水棱体。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
As well as to reduce the saturation line and pore pressure, and increased stability, and downstream as well as additional stack stone foot Site drainage edge.
  • 匿名
2013-05-23 12:24:58
In order to reduce the dam line of saturation and the pore pressure, the increase dam is stable, the downstream toe of dam spot additionally builds piles up stones the draining water bank or ridge between fields body.
  • 匿名
2013-05-23 12:26:38
To reduce dam saturation line and pore pressure, increasing the stability of the dam, downstream of dam toe parts of additional rock drainage prisms.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭