当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:①坝体外形尺寸整治②坝体迎水坡、背水坡处理③溢洪道改建④水库清淤⑤新建小供水系统是什么意思?

待解决 悬赏分:1 - 离问题结束还有
①坝体外形尺寸整治②坝体迎水坡、背水坡处理③溢洪道改建④水库清淤⑤新建小供水系统
问题补充:

  • 匿名
2013-05-23 12:21:38
① dam shape size regulation (2) dam welcome water slope, downstream slope handle ③ spillway The ④ reservoir dredging ⑤ new small water supply systems
  • 匿名
2013-05-23 12:23:18
Dimensions 1 and 2 as well as rectify all usher water uphill, back-to-the-water uphill with 3 4 reservoir spillway alterations-silted 5 new small water systems
  • 匿名
2013-05-23 12:24:58
①Dam external dimensions improvement②The dam welcomes Shui Po, the backwater slope processing③Spillway reconstruction④Reservoir clear silt⑤Newly built small water supply system
  • 匿名
2013-05-23 12:26:38
① Dam regulation ② dam upstream slope of dimensions reconstruction ④, rear ③ spillway slope water treatment reservoir desilting ⑤ create small water supply system
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭