求翻译:受当时施工技术条件的限制,大坝采用人工填筑建成,大坝填筑质量达不到规范要求;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
受当时施工技术条件的限制,大坝采用人工填筑建成,大坝填筑质量达不到规范要求;
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
The construction technology at that time, the limits of the terms in dam artificial landfill reclamation Dam was built, and not up to quality standards;
  • 匿名
2013-05-23 12:24:58
At that time constructs the engineering factor limit, the dam uses the artificial reclamation to complete, the dam reclamation quality cannot meet the standard requirements;
  • 匿名
2013-05-23 12:26:38
Limited by the construction specifications and manual filling of the dam is completed, dam filling quality does not meet the specifications;
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 