当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:当隧道工程遇到软弱围岩,高地应力区域时,施工及维护会非常困难,常常会出现围岩大变形,有时甚至连正常施工安全都难以保证。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
当隧道工程遇到软弱围岩,高地应力区域时,施工及维护会非常困难,常常会出现围岩大变形,有时甚至连正常施工安全都难以保证。
问题补充:

  • 匿名
2013-05-23 12:21:38
When the tunnel works to encounter soft surrounding rock, high ground stress zone, construction and maintenance will be very difficult, and often the surrounding rock mass deformation, and sometimes even normal construction safety is difficult to guarantee.
  • 匿名
2013-05-23 12:23:18
When the tunnel experience weakness of stress, the highland Rock area, construction and maintenance will be very difficult and often the large deformation of rock, and at times it may not even work properly, it is difficult to guarantee security.
  • 匿名
2013-05-23 12:24:58
When the tunneling meets the weak adjacent formation, when high crustal stress region, the construction and the maintenance can be extremely difficult, can appear the adjacent formation big distortion frequently, sometimes even continually the normal construction safe all with difficulty guaranteed.
  • 匿名
2013-05-23 12:26:38
When encountered weak surrounding rock of tunnel engineering, high stress areas, construction and maintenance can be difficult, often surrounding rock deformation can occur, sometimes even difficult to ensure normal construction safety.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭