当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:非因不可抗力单方面停止履行合同及工程中途停建 缓建或因所供的技术要求错误,及所供应的材料质量问题,造成乙方人力 物力 财力的损失,要予以赔偿, 乙方已发生的前期工程款于10日内付清,并按我款标的百分之十计付违约金是什么意思?

待解决 悬赏分:1 - 离问题结束还有
非因不可抗力单方面停止履行合同及工程中途停建 缓建或因所供的技术要求错误,及所供应的材料质量问题,造成乙方人力 物力 财力的损失,要予以赔偿, 乙方已发生的前期工程款于10日内付清,并按我款标的百分之十计付违约金
问题补充:

  • 匿名
2013-05-23 12:21:38
Non-stop half-way to fulfill the contract and engineering cessation of postponed or error due to the technology for the requirements and the supply of material quality problems unilaterally by force majeure, resulting in the loss of the B human and material resources to be compensated, Party B has o
  • 匿名
2013-05-23 12:23:18
For reasons of force majeure unilateral non-fulfilment of the contract and stop the stop-down for building or on the technical requirements of the error, and the supply of quality of material, Party B has the resources, you want to be compensated for losses, Party B has occurred on the upfront engin
  • 匿名
2013-05-23 12:24:58
Because because non-the force majeure stops the fulfillment contract and the project midway unilaterally halts construction the slow construction or the specification mistake which supplies, and supplies the material quality question, creates the second party manpower physical resource financial res
  • 匿名
2013-05-23 12:26:38
Not due to force majeure to stop unilaterally cancel or defer, or in the middle of contract and engineering because of the technical requirements for error, and the quality of material supply problems, cause b loss of manpower and financial resources, to be compensated, party b has occurred should b
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭