当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:挡水建筑物为复合土工膜心墙坝,最大坝高17米,坝长60.1米;泄洪建筑物采用正槽溢洪道,底流消能;放水建筑物采用卧管和涵管连接的方式,放水口型式选用斜拉闸门式,涵管后接下游放水明渠,涵管全长81米。。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
挡水建筑物为复合土工膜心墙坝,最大坝高17米,坝长60.1米;泄洪建筑物采用正槽溢洪道,底流消能;放水建筑物采用卧管和涵管连接的方式,放水口型式选用斜拉闸门式,涵管后接下游放水明渠,涵管全长81米。。
问题补充:

  • 匿名
2013-05-23 12:21:38
Retaining structure for the composite geomembrane core dam, the maximum height of 17 meters, the dam is 60.1 meters long; the spillway building is spillway and energy dissipation; water building horizontal pipe and culvert connection, water port type selection of cable-stayed gate type, followed dow
  • 匿名
2013-05-23 12:23:18
The water building a composite leeves heart walls, as well as the dam 17 meters high, 60.1 meters long as well as runoff; buildings are slot the spillway, the flow of water lying buildings covered by tube and pipe connection to the water, and on-line using a drop-down gate, covered by tube followed
  • 匿名
2013-05-23 12:24:58
Keeps off the water building for the compound earthwork membrane heart wall dam, most dam height 17 meters, dam length 60.1 meters; The flood discharge building uses the trough spillway, the undercurrent disappears energy; Turns on the water the building to use lies the way which the tube and the cu
  • 匿名
2013-05-23 12:26:38
Water retaining dam with core wall of building multiple geo-membranes, maximum height of 17 m, dam of 60.1 meters long; chute spillway flood buildings, underflow energy dissipation; water building a horizontal pipe and culvert connecting way, discharge of mouth shapes-selection of inclined gate, cul
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭