当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:上瑞高速公路湖南邵阳至怀化段K76+257.5~K76+449.5工点左幅为路基,右幅为桥梁。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
上瑞高速公路湖南邵阳至怀化段K76+257.5~K76+449.5工点左幅为路基,右幅为桥梁。
问题补充:

  • 匿名
2013-05-23 12:21:38
K76 +257.5 ~ k76 +449.5 working point on Ruili Expressway in Hunan Shaoyang, Huaihua segment left pieces of the roadbed, the right hand side of the bridge.
  • 匿名
2013-05-23 12:23:18
Shaoyang, Hunan on highway to Huaihua K paragraph 257.5 ~76 + 76 + 449.5 K duplex, point-to-left base, right in Bridge.
  • 匿名
2013-05-23 12:24:58
On the Swiss highway Hunan Shaoyang to Huaihua section K76+257.5~K76+449.5 labor left is the roadbed, right is a bridge.
  • 匿名
2013-05-23 12:26:38
Shui on Hunan Shaoyang-Huaihua section of Expressway subgrade of K76+257.5~K76+449.5 workers left for lots, site for the bridge on the right.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭