当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:烤漆房和准备工位设备离10轴线过近,将会与墙面基础和下水管道等产生严重干涉,经过与设备供应商新纶公司现场协调,拟将烤漆房与墙面距离增至1500mm,准备是什么意思?

待解决 悬赏分:1 - 离问题结束还有
烤漆房和准备工位设备离10轴线过近,将会与墙面基础和下水管道等产生严重干涉,经过与设备供应商新纶公司现场协调,拟将烤漆房与墙面距离增至1500mm,准备
问题补充:

  • 匿名
2013-05-23 12:21:38
10 axis in the paint room and prepared to work equipment from the past, will be wall-mounted base and sewer serious interference coordination after the scene with equipment suppliers Lun company intends to paint the room with the wall distance increased 1500mm, Preparation
  • 匿名
2013-05-23 12:23:18
Paint the room and prepared for the device 10 axis will be too close, and the wall Foundation and conduit, a serious interference with the equipment supplier, new yarns company on-site coordination, it is intended that the paint room wall distance increased to 1500 mm, and ready to
  • 匿名
2013-05-23 12:24:58
Roasts the japanning room and prepares the location equipment excessively to be near to 10 spool threads, will be able and the wall surface foundation and the sewer pipe and so on has the serious interference, will pass through and the equipment supplier new black silk ribbon company scene is coordi
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭