当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:When a building is destroyed or damaged by fire, wind or other peril, debris is left that must be removed before reconstruction can occur. The business policy, within certain conditions, covers the cost of removing debris left behind as a result of a covered cause of loss. There is an extra $10,000 of coverage for debr是什么意思?

待解决 悬赏分:1 - 离问题结束还有
When a building is destroyed or damaged by fire, wind or other peril, debris is left that must be removed before reconstruction can occur. The business policy, within certain conditions, covers the cost of removing debris left behind as a result of a covered cause of loss. There is an extra $10,000 of coverage for debr
问题补充:

  • 匿名
2013-05-23 12:21:38
建筑物被摧毁或损坏火,风或其他危险时,碎片,必须拆除重建可以发生之前离开。的经营方针,在一定条件下,去除覆盖事业的损失背后留下的碎片覆盖成本。有杂物清除额外的10,000美元的覆盖率应达到保险限额杂物清除之前已经分解英寸
  • 匿名
2013-05-23 12:23:18
当一座建筑物被破坏或损坏的火、风或其他危险,是碎片之前,必须取下左,重建可以发生。 企业的政策,在一定条件下,包括拆除费用的碎片抛在一边,因为一个涵盖导致的一个结果。 有一个额外的覆盖1万元的限制应清除碎片的保险之前达成碎片清除已计入在内。
  • 匿名
2013-05-23 12:24:58
当大厦毁坏或火、风或者其他危险时损坏,必须取消的残骸被留下,在重建可能发生之前。 由于损失的报道的起因营业方%
  • 匿名
2013-05-23 12:26:38
在重建可以发生之前,必须删除当建筑物是摧毁或损坏的火,风或其他危险,碎片离开的。业务策略,在某些情况下,包括删除碎片落在后面盖损失原因的结果的成本。有额外 10,000 美元的覆盖范围为碎片去除应保险的限制必须达到已考虑到碎片去除。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭